Chapter 04

Team view: Same system, three jobs, on an ordinary Monday.

The estimator opens a draft costing with candidate comparables, current inputs and source links instead of a blank sheet and a search box.

Illustrative

An example firm built from firms like yours, for demonstration only. Not a client. We model the inputs and the queue examples, then derive every total from the assumptions shown. A real audit measures each workflow in your operation.

Profile
Industrial manufacturer
Revenue
€22M
People
90
Sites
2

What they see

Estimator

Prices the work

Opens a sourced draft with candidate comparables and current inputs. Confirms lot size, routing, setup and cycle time, tooling, yield, subcontract work, capacity and overhead before pricing risk and margin.

5
Qualified RFQs priced this week
16
RFQ preparation hours carried this week
4
Exception queues

Commercial lead

Decides what to bid

Sees every qualified RFQ, its sourced sales value, bid/no-bid status and which response windows are about to close.

Owner

Watches the pipeline

Tenders in, tenders answered, tenders won, and the ones nobody got to. That last number used to be invisible.

What still needs a person

The system does not decide these. It gathers everything the decision needs, then waits.

  • Tolerance outside the usual

    needs you today

    The current drawing revision asks for tighter than the approved process holds. Costing stops here and goes to Engineering to say whether we can hold it.

    RFQ value · €142,000

  • Lead time we cannot promise

    needs you today

    The supplier quotes material at eleven weeks. The tender wants eight. Someone decides whether to bid it.

    RFQ value · €61,500

  • Material price moved

    this week

    The comparable job used a price that is three months old and no longer holds.

    RFQ value · €28,900

  • Certificate not on file

    needs you today

    The controlled Quality library holds no current approved certificate. The response waits for Quality to verify it.

    Approval required

This does not remove anyone

The hours the system could take on are the retyping, the chasing and the looking-up. Your team keeps the part of the job that needed a person: the judgment, the exceptions and the customers. If a build would take somebody's job instead of the dull half of it, we say so before it starts.