Chapter 03

Implementation process: The first build, followed by the audited roadmap.

The system prepares a sourced draft take-off and cost build-up. The estimator checks the scope and the measurement, then sets risk, prelims and margin. Nothing leaves the office without approval.

Illustrative

An example firm built from firms like yours, for demonstration only. Not a client. We model the inputs and the queue examples, then derive every total from the assumptions shown. A real audit measures each workflow in your operation.

Profile
Contractor
Revenue
€18M
People
70
Live sites
6

The first build and what comes after it

P1 · first build

Estimating and take-off

The system checks tender drawings, specification and any supplied pricing schedule. It measures missing or changed quantities into a draft. It applies approved rates and supplier quotes that still stand. Each one carries its source, its date and what it leaves out.

Hours a year
1,320
Modelled share the system could carry
55%

P2 · audited roadmap

Supplier price chasing

Requests and reminders automated; replies compared on scope, delivery, validity, exclusions and substitutions as well as price. Non-responses stay visible.

Hours a year
680
Modelled share the system could carry
70%

P3 · audited roadmap

Site reports and daily logs

A guided update becomes a draft daily record, with the original audio and photographs linked. The system flags missing labour, plant, delivery, weather, safety or delay details for the site manager.

Hours a year
1,040
Modelled share the system could carry
65%

P4 · audited roadmap

Changes, variations and valuations

What changed, when you notified it and what it costs. The system assembles the instruction, the site record and the photographs for commercial review.

Hours a year
430
Modelled share the system could carry
60%

P5 · audited roadmap

Subcontractor document collection and expiry tracking

Documents collected, dates extracted and missing or expiring items flagged. An authorised person confirms validity, scope and site-access status.

Hours a year
310
Modelled share the system could carry
75%

Modelled opportunity across all five

2,369
Hours a year the system could carry
€108,974
Equivalent internal capacity at the loaded cost above
1,411
Hours a year that stay with your team

All five processes, not the one traced below. This is a capacity equivalent, not cash saved or revenue forecast. It excludes implementation cost, operating cost, review time and adoption. The audit is where these become your numbers instead of ours.

One process, end to end

Estimating and take-off

The first one, step by step, including the place a person stays in the loop and what happens to their correction afterwards.

  1. 01

    Checks the drawings and pricing schedule

    It identifies the tender pack, specification and current revisions before measurement starts.

    System prepares
  2. 02

    Prepares the draft quantities

    Measured against the supplied schedule where one exists. It marks changed, missing or unclear scope instead of assuming it.

    System prepares
  3. 03

    Prices it from the library and live quotes

    Approved rates first, supplier quotes only inside their validity period, and each line showing source, date and exclusions.

    System prepares
  4. 04

    The estimator validates and prices it

    Scope, measurement, programme risk, ground conditions, preliminaries, margin and whether this client is worth winning stay with a person.

    Your team approves
  5. 05

    Returns the priced tender

    Held for estimator approval, then returned in the required format. It writes out the assumptions and exclusions, so nobody argues them later.

    System prepares

We log every edit. A named process owner approves a repeatable rule before we version it and reuse it. One-off exceptions stay one-off. We test every change before release.

Of that, this one process accounts for 726 hours a year